{
 "type": "mcp",
 "name": "Critical Path Partners",
 "registry_name": "ca.criticalpathpartners/primavera-p6-forensic-scheduling",
 "also_published_as": [],
 "description": "Primavera P6 XER forensic scheduling: AACE windows, TIA, impacted as-planned, DCMA-14, Monte Carlo.",
 "url": "https://mcp.criticalpathpartners.ca/mcp",
 "transport": "streamable-http",
 "website": "https://criticalpathpartners.ca",
 "repo": "https://github.com/danafitkowski/cpp-cpm-engine",
 "ours": false,
 "publisher": "ca.criticalpathpartners",
 "categories": [
  "engineering",
  "logistics",
  "productivity"
 ],
 "tests": {
  "tested_at": "2026-11-24T21:34:52.247Z",
  "http_status": 200,
  "initialize": "ok",
  "tools_list": "ok",
  "tool_count": 14,
  "latency_ms": 150,
  "tools_list_ms": 223,
  "protocol_version": "2025-06-18",
  "oauth_discovery": null,
  "server_info": {
   "name": "cpp-forensic-mcp",
   "version": "2.10.20"
  },
  "error": null
 },
 "signals": {
  "github_stars": 5,
  "license": "MIT",
  "repo_pushed_at": "2026-11-22T08:32:58Z",
  "repo_archived": false,
  "npm_downloads_30d": null,
  "adoption_note": null,
  "registry_updated_at": "2026-11-10T14:18:05.94768Z",
  "registry_published_at": "2026-11-10T14:18:05.94768Z",
  "pypi_downloads": "missing"
 },
 "checks": {
  "latency": 100,
  "tool_docs": 100,
  "breadth": 68.9,
  "freshness": 100,
  "license": 100,
  "adoption": 19.5,
  "protocol": 100
 },
 "score": 72.7,
 "missing": [],
 "tools": [
  "forensic_windows_analysis",
  "concurrent_delay_matrix",
  "woet_classifier",
  "slip_velocity",
  "collapsed_as_built",
  "time_impact_analysis_fragnet",
  "impacted_as_planned",
  "critical_path_validator",
  "dcma14_health_check",
  "path_explorer",
  "monte_carlo_p50_p80",
  "qramm_maturity",
  "claim_workbench_evidence_ledger",
  "xer_parser"
 ],
 "tool_docs": [
  {
   "n": "forensic_windows_analysis",
   "d": "Run forensic windows analysis (AACE RP 29R-03 §3.3, MIP 3.3 Observational / Dynamic / Contemporaneous As-Is) across multiple Primavera P6 XER snapshots and retu"
  },
  {
   "n": "concurrent_delay_matrix",
   "d": "Build the per-window x per-party concurrent-delay attribution matrix from a chronological list of XER snapshots. Implements the per-window concurrency view per "
  },
  {
   "n": "woet_classifier",
   "d": "Worked-vs-On-time Execution Timeline (WOET) per-activity day-by-day classification of as-built execution against baseline. For each pairable activity (matched b"
  },
  {
   "n": "slip_velocity",
   "d": "Per-window slip velocity & acceleration trend across XER snapshots. Computes three signed metrics per window from the underlying forensic windows analysis: - sl"
  },
  {
   "n": "collapsed_as_built",
   "d": "Collapsed As-Built / But-For analysis on a post-impact XER. Implements AACE RP 29R-03 §3.8 Modeled / Subtractive / Single Simulation method (paired with MIP 3.3"
  },
  {
   "n": "time_impact_analysis_fragnet",
   "d": "Time Impact Analysis (TIA) — prospective fragnet insertion into a pre-impact baseline schedule. Supports two modes. **Single-base mode** (legacy): supply ``base"
  },
  {
   "n": "impacted_as_planned",
   "d": "Impacted As-Planned (IAP) on an unprogressed as-planned baseline. Implements AACE RP 29R-03 MIP 3.6 (Modeled / Additive / Single Base) and SCL Protocol 2nd ed. "
  },
  {
   "n": "critical_path_validator",
   "d": "Critical-path validation, logic health, and DCMA-14 assessment of a Primavera P6 schedule. Runs the CPP critical-path validator: checks for false criticality, c"
  },
  {
   "n": "dcma14_health_check",
   "d": "Full Schedule Health Dashboard HTML report — DCMA-14 + CPLI + BEI + variance/slip register against the baseline. Wraps the CPP Schedule Health Review skill, whi"
  },
  {
   "n": "path_explorer",
   "d": "Logic-trace driver-chain explorer — answers \"WHY is this activity critical?\" and \"WHAT does it drive?\". Traces driving predecessors backward from a target activ"
  },
  {
   "n": "monte_carlo_p50_p80",
   "d": "Monte Carlo Schedule Risk Analysis — P10/P50/P80/P90 completion-date forecast for a Primavera P6 schedule. Implements an AACE-style quantitative SRA (the same m"
  },
  {
   "n": "qramm_maturity",
   "d": "QRAMM-aligned maturity reading for an SRA result. Places a Schedule Risk Analysis run (from ``monte_carlo_p50_p80`` or any equivalent dict) on the five named ma"
  },
  {
   "n": "claim_workbench_evidence_ledger",
   "d": "Forensic claim workbench — analyzes a folder of mixed evidence (XER chain + MSG/PDF/DOCX/XLSX correspondence) and produces a unified workbench dashboard. Built "
  },
  {
   "n": "xer_parser",
   "d": "Parse a Primavera P6 XER file and return a TABLE SUMMARY (not the full row-level data — XER row dumps explode the MCP context window). For each table in the XER"
  }
 ],
 "passed": true,
 "auth_required": false,
 "fail_reason": null,
 "category_confidence": 0.367,
 "category_source": "hand",
 "category_scores": {
  "productivity": 1.09,
  "logistics": 1.03,
  "health": 0.57,
  "design-docs": 0.29
 },
 "subcategory": null,
 "id": "ca-criticalpathpartners-primavera-p6-forensic-scheduling",
 "listing": {
  "plan": "curated",
  "fee_usd": null,
  "note": "Listing fees are not active. Placement is earned only by test results."
 },
 "status": "listed",
 "first_seen": "2026-11-24",
 "uptime_days": "2/2",
 "override": {
  "category": "engineering",
  "note": "hand-check"
 },
 "ranks": [
  {
   "category": "engineering",
   "kind": "mcp",
   "rank": 9
  }
 ]
}