{
 "type": "mcp",
 "name": "DC Hub: Data Center & Energy Intelligence",
 "registry_name": "cloud.dchub/mcp-server",
 "also_published_as": [],
 "description": "Orchestration layer for data center and energy intelligence. execute_plan, DCPI, power grid, fiber.",
 "url": "https://dchub.cloud/mcp",
 "transport": "streamable-http",
 "website": "https://dchub.cloud",
 "repo": "https://github.com/azmartone67/dchub-mcp-server",
 "ours": false,
 "publisher": "cloud.dchub",
 "categories": [
  "engineering",
  "finance",
  "agent-infra"
 ],
 "tests": {
  "tested_at": "2026-11-24T21:34:56.786Z",
  "http_status": 200,
  "initialize": "ok",
  "tools_list": "ok",
  "tool_count": 98,
  "latency_ms": 174,
  "tools_list_ms": 374,
  "protocol_version": "2025-06-18",
  "oauth_discovery": null,
  "server_info": {
   "name": "DC Hub",
   "version": "2.12.63"
  },
  "error": null
 },
 "signals": {
  "github_stars": 3,
  "license": "MIT",
  "repo_pushed_at": "2026-11-25T01:14:49Z",
  "repo_archived": false,
  "npm_downloads_30d": 4660,
  "adoption_note": null,
  "registry_updated_at": "2026-11-23T08:12:11.591972Z",
  "registry_published_at": "2026-11-23T08:12:11.591972Z",
  "pypi_downloads": "missing"
 },
 "checks": {
  "latency": 100,
  "tool_docs": 100,
  "breadth": 100,
  "freshness": 100,
  "license": 100,
  "adoption": 61.1,
  "protocol": 100
 },
 "score": 88.3,
 "missing": [],
 "tools": [
  "execute_plan",
  "get_api_key",
  "search",
  "fetch",
  "search_facilities",
  "get_facility",
  "get_market_intel",
  "get_market_dcpi_rank",
  "predict_market_trajectory",
  "get_gas_index",
  "get_gas_economics",
  "get_grid_scoreboard",
  "compare_isos",
  "get_intelligence_index",
  "list_transactions",
  "get_news",
  "semantic_search",
  "search_intelligence",
  "get_market_context",
  "get_iso_context",
  "get_pipeline",
  "get_power_pipeline",
  "get_infra_projects",
  "get_power_availability_timeline",
  "get_global_power",
  "get_interconnection_queue",
  "get_refined_queue",
  "get_retirement_headroom",
  "get_hosting_capacity",
  "analyze_parcel",
  "rank_sites",
  "discover_tools",
  "plan_query",
  "save_to_shortlist",
  "get_shortlist",
  "set_shortlist_alert",
  "suggest_reallocation",
  "get_grid_data",
  "get_changes",
  "get_facility_risk_delta",
  "save_site",
  "list_saved_sites",
  "set_market_alert",
  "subscribe_digest",
  "set_site_alert",
  "export_dataset",
  "find_sites",
  "analyze_site",
  "get_composite_site_score",
  "get_disaster_risk",
  "get_climate_intel",
  "generate_site_analysis",
  "compare_sites",
  "get_infrastructure",
  "get_fiber_intel",
  "get_fiber_readiness",
  "get_subsea_cables",
  "get_peering_intel",
  "get_metro_fiber",
  "get_energy_prices"
 ],
 "tool_docs": [
  {
   "n": "execute_plan",
   "d": "Answers any data center power, grid, interconnection queue, time-to-power, fiber or site question in one call. Pass the user's question unchanged as intent. Ret"
  },
  {
   "n": "get_api_key",
   "d": "Use this when the user wants more DC Hub data center data than keyless allows, or asks for a key; no key is needed to start. DATA USE: the optional email, used "
  },
  {
   "n": "search",
   "d": "Use this when a Deep Research or ChatGPT-connector client needs a data center facility search (search/fetch format). Returns a list of matching data-center faci"
  },
  {
   "n": "fetch",
   "d": "Use this when you have an id from `search` and need that data center facility record (search/fetch format). Returns {id, title, text, url, metadata} — a citable"
  },
  {
   "n": "search_facilities",
   "d": "Use this when the user asks which data centers exist, or who operates in a city, state or country; filters: country, state, city, operator, MW range, tier or te"
  },
  {
   "n": "get_facility",
   "d": "Use this when the user asks about one data center facility: name, operator, address, lat/lon, power capacity (MW total/used), cooling type, fiber providers (cou"
  },
  {
   "n": "get_market_intel",
   "d": "Use this when the user asks about a data-center market (metro supply, operators, pipeline, pricing): facility count, tracked MW, status mix, top providers, rece"
  },
  {
   "n": "get_market_dcpi_rank",
   "d": "Use this when the user asks where a data center can get grid power, how fast, or whether a market is a BUILD, CAUTION or AVOID (e.g. \"Where can a 100 MW data ce"
  },
  {
   "n": "predict_market_trajectory",
   "d": "Use this when the user asks where a data center market's power outlook is heading (next 1-8 quarters). Projects excess_power_score and constraint_score forward "
  },
  {
   "n": "get_gas_index",
   "d": "Use this when the user asks which US states suit gas-fired data center power: the Data Center Gas Index (DCGI), a per-state score. ★ DO NOT COMPARE a DCGI figur"
  },
  {
   "n": "get_gas_economics",
   "d": "Use this when the user asks what behind-the-meter gas power costs in a US data-center market: Henry Hub spot, regional basis differential, and the delivered ind"
  },
  {
   "n": "get_grid_scoreboard",
   "d": "Use this when the user asks how power grids compare: demand, fuel mix or renewable share. GLOBAL grid scoreboard — 9 US grid operators (the 7 US ISOs PJM, ERCOT"
  },
  {
   "n": "compare_isos",
   "d": "Use this when the user asks to compare two to four power grids side by side — fuel mix, demand, renewable/gas share, and for the US ISOs interconnection-queue d"
  },
  {
   "n": "get_intelligence_index",
   "d": "Use this when the user asks how the data center market looks overall, across all markets: ONE global DC Hub index, not a per-market score, and it takes no argum"
  },
  {
   "n": "list_transactions",
   "d": "Use this when the user asks about data center M&A, acquisitions or capital deals — tracked deals (2019-present; total_count in the result, where shown, gives th"
  },
  {
   "n": "get_news",
   "d": "Use this when the user asks for data center industry news or headlines (execute_plan also pulls news inside a broader market question). Curated data center indu"
  },
  {
   "n": "semantic_search",
   "d": "Use this when a data center or energy question is conceptual or fuzzy and keyword filters fall short — semantic (meaning-based) retrieval across DC Hub's indust"
  },
  {
   "n": "search_intelligence",
   "d": "Use this when you need meaning-based search over DC Hub's data center intelligence corpus, choosing corpora — industry news, M&A deals, discovered facilities, p"
  },
  {
   "n": "get_market_context",
   "d": "Use this when you need a whole data center market briefing for your context window — one call returns a token-budgeted context pack for a data-center market: DC"
  },
  {
   "n": "get_iso_context",
   "d": "Use this when you need a whole power grid (ISO) briefing for your context window — one call returns a token-budgeted context pack for a US ISO/RTO: live grid sn"
  },
  {
   "n": "get_pipeline",
   "d": "Use this when the user asks what data centers are being built, announced or permitted in a market or by an operator. Example: \"What is under construction in Nor"
  },
  {
   "n": "get_power_pipeline",
   "d": "Use this when the user asks where new power generation is coming online (the forward supply pipeline) — e.g. \"how much new generation is planned in Virginia / t"
  },
  {
   "n": "get_infra_projects",
   "d": "Use this when the user asks what gas pipeline or transmission line projects are planned, proposed, approved or under construction — the forward build-out, not t"
  },
  {
   "n": "get_power_availability_timeline",
   "d": "Use this when the user asks when power will be available, or about time-to-power, in a US state: year by year. Composes: new generation coming online from EIA-8"
  },
  {
   "n": "get_global_power",
   "d": "Use this when the user asks about power plants worldwide or in a non-US country — operating AND the forward pipeline (announced / pre-construction / under-const"
  },
  {
   "n": "get_interconnection_queue",
   "d": "Use this when the user asks about grid interconnection queues: how congested an ISO's queue is or how much data-center load is waiting. Returns queued generatio"
  },
  {
   "n": "get_refined_queue",
   "d": "Use this when you need interconnection queue projects filtered server-side. Instead of pulling the raw queue into context to filter (token-expensive, error-pron"
  },
  {
   "n": "get_retirement_headroom",
   "d": "Use this when the user asks where retiring power plants free grid capacity: scans EIA-860M retirements to find near-term transmission grid headroom — a retiring"
  },
  {
   "n": "get_hosting_capacity",
   "d": "Use this when the user asks how many MW a distribution feeder can take: utility-published hosting capacity — the MW a NAMED distribution feeder can actually tak"
  },
  {
   "n": "analyze_parcel",
   "d": "Use this when the user has a land parcel for a data center site: structured read of its boundary — pass your own GeoJSON Polygon/MultiPolygon, OR just lat+lon a"
  },
  {
   "n": "rank_sites",
   "d": "Use this when you have enriched candidate data center sites to rank under constraints — the normalization contract that lets you compare sites across separate a"
  },
  {
   "n": "discover_tools",
   "d": "Use this when you are unsure which DC Hub data center, power or grid tool fits: lists tools by family. Returns _entity=tool_families — a front_door block (execu"
  },
  {
   "n": "plan_query",
   "d": "Use this when you want to see the plan for a data center question without running it (execute_plan runs the same planner and returns the answers). Reach for pla"
  },
  {
   "n": "save_to_shortlist",
   "d": "Use this when the user wants to keep a data center site on a named shortlist that survives across conversations (Phase 5 statefulness). Snapshots the site's obj"
  },
  {
   "n": "get_shortlist",
   "d": "Use this when the user wants to see a saved data center site shortlist. With refresh=true (default) each site is RE-SCORED against the current national percenti"
  },
  {
   "n": "set_shortlist_alert",
   "d": "Use this when the user wants a drift alert on a saved site shortlist so you can stop polling and be notified when a site's national standing moves materially (P"
  },
  {
   "n": "suggest_reallocation",
   "d": "Use this when a saved data center site drifts (its national standing dropped — surfaced by get_shortlist refresh or a set_shortlist_alert firing), get replaceme"
  },
  {
   "n": "get_grid_data",
   "d": "Use this when the user asks for live electricity grid data (power demand, fuel mix) for one grid: the 7 US ISOs (PJM, ERCOT, CAISO, MISO, SPP, NYISO, ISO-NE), T"
  },
  {
   "n": "get_changes",
   "d": "Use this when the user asks what changed in data center markets, facilities or deals since a date. Returns DCPI 7-day market movers, newly discovered facilities"
  },
  {
   "n": "get_facility_risk_delta",
   "d": "Use this when the user asks how a data center facility's (or its market's) power risk changed recently — \"has this site gotten riskier lately?\". Returns the REA"
  },
  {
   "n": "save_site",
   "d": "Use this when the user wants to save a data-center site to track it. Needs a key (get_api_key); keyless returns auth_required. Save a candidate data-center site"
  },
  {
   "n": "list_saved_sites",
   "d": "Use this when the user asks to see their saved data center sites. Needs a key (get_api_key); keyless returns auth_required, not an empty list. Use when a user a"
  },
  {
   "n": "set_market_alert",
   "d": "Use this when the user wants alerts on a data center market's DCPI power score: subscribes to movement alerts (needs a key) — get notified when its Excess-Power"
  },
  {
   "n": "subscribe_digest",
   "d": "Use this when the user asks for a weekly data center market email: subscribes them to a digest of what changed in the markets and sites they queried (DCPI mover"
  },
  {
   "n": "set_site_alert",
   "d": "Use this when the user wants an email watch on a saved data center site (needs a key) — DC Hub emails you when that site’s DCPI score, grid capacity, or nearby "
  },
  {
   "n": "export_dataset",
   "d": "Use this when the user wants to export their saved data center sites for offline analysis, a spreadsheet, or ingestion into another tool (needs a full-access ke"
  },
  {
   "n": "find_sites",
   "d": "Use this when the user has no data center site yet and wants candidate search areas (site selection by substation voltage, gas and fiber distance); execute_plan"
  },
  {
   "n": "analyze_site",
   "d": "Use this when the user asks whether a specific site or coordinate works for a data center (lat/lon, or a market name for a market-level read). Returns a 0-100 c"
  },
  {
   "n": "get_composite_site_score",
   "d": "Use this when the user wants one 0-100 data center site suitability verdict for a lat/lon WITH an explicit per-factor coverage map — which factors are actually "
  },
  {
   "n": "get_disaster_risk",
   "d": "Use this when the user asks about natural-hazard risk for a data center site (US lat/lon) — flood, wildfire, hurricane, earthquake, heat, drought, tornado, etc."
  },
  {
   "n": "get_climate_intel",
   "d": "Use this when the user asks about seismic or climate design inputs for a data center site (lat/lon) — the layer that drives data-center structural bracing cost "
  },
  {
   "n": "generate_site_analysis",
   "d": "Use this when the user wants a shareable data center Site Analysis PDF for ONE lat/lon (a powered-land parcel, a candidate campus) — the polished client deliver"
  },
  {
   "n": "compare_sites",
   "d": "Use this when the user has 2-4 candidate data center sites and asks which is best. Pass locations as \"lat,lon;lat,lon\" and optional capacity_mw. Returns each si"
  },
  {
   "n": "get_infrastructure",
   "d": "Use this when the user asks what power infrastructure is near a site: substations (count + max voltage_kv within radius), transmission lines (>69 kV path overla"
  },
  {
   "n": "get_fiber_intel",
   "d": "Use this when the user asks about fiber routes, carriers or connectivity for a market: long-haul, metro, dark or IX routes. Filter by carrier, route_type, marke"
  },
  {
   "n": "get_fiber_readiness",
   "d": "Use this when the user asks whether one data center site (lat/lon) is fiber-ready: near-net distance to a carrier-served facility, how many distinct fiber carri"
  },
  {
   "n": "get_subsea_cables",
   "d": "Use this when the user asks about subsea (submarine) cable landings near a site, or the cable catalogue. The physical internet crossing an ocean lands at a fini"
  },
  {
   "n": "get_peering_intel",
   "d": "Use this when the user asks about internet exchange (IX) and peering density for a data center site (PeeringDB). Pass lat+lon for the PEERING PROFILE around tha"
  },
  {
   "n": "get_metro_fiber",
   "d": "Use this when the user asks which US metro has the deepest fiber, or wants a market's fiber profile — carrier count, total route-miles, on-net buildings, a 0-10"
  },
  {
   "n": "get_energy_prices",
   "d": "Use this when the user asks what electricity or natural gas costs for a data center in a US ISO or state (\"what does power cost in ERCOT?\", \"retail rate in Virg"
  }
 ],
 "passed": true,
 "auth_required": false,
 "fail_reason": null,
 "category_confidence": 0.882,
 "category_source": "hand",
 "category_scores": {
  "agent-infra": 2,
  "devops": 0.32,
  "weather": 0.23,
  "comms": 0.17
 },
 "subcategory": null,
 "id": "cloud-dchub-mcp-server",
 "listing": {
  "plan": "curated",
  "fee_usd": null,
  "note": "Listing fees are not active. Placement is earned only by test results."
 },
 "status": "listed",
 "first_seen": "2026-11-24",
 "uptime_days": "2/2",
 "override": {
  "category": "engineering",
  "note": "hand-check"
 },
 "ranks": [
  {
   "category": "engineering",
   "kind": "mcp",
   "rank": 1
  }
 ]
}