{
 "type": "mcp",
 "name": "Spark Pack",
 "registry_name": "io.github.Nero-Engine/spark-pack",
 "also_published_as": [],
 "description": "Cable sizing, Part P, certificate checks and G98/G99 for UK electricians' AI assistants",
 "url": "https://spark-pack.nerolabs.workers.dev/mcp",
 "transport": "streamable-http",
 "website": "https://spark-pack.nerolabs.workers.dev/docs",
 "repo": "https://github.com/Nero-Engine/spark-pack-mcp",
 "ours": false,
 "publisher": "io.github.nero-engine",
 "categories": [
  "gov-records",
  "engineering",
  "security"
 ],
 "tests": {
  "tested_at": "2026-11-24T21:38:57.656Z",
  "http_status": 200,
  "initialize": "ok",
  "tools_list": "ok",
  "tool_count": 7,
  "latency_ms": 141,
  "tools_list_ms": 120,
  "protocol_version": "2025-06-18",
  "oauth_discovery": null,
  "server_info": {
   "name": "nerolabs-spark-pack",
   "version": "1.1.0"
  },
  "error": null
 },
 "signals": {
  "github_stars": 0,
  "license": null,
  "repo_pushed_at": "2026-11-13T00:17:09Z",
  "repo_archived": false,
  "npm_downloads_30d": null,
  "adoption_note": null,
  "registry_updated_at": "2026-11-13T00:19:51.063807Z",
  "registry_published_at": "2026-11-13T00:19:51.063807Z",
  "pypi_downloads": "missing"
 },
 "checks": {
  "latency": 100,
  "tool_docs": 100,
  "breadth": 52.9,
  "freshness": 100,
  "license": 0,
  "adoption": 0,
  "protocol": 100
 },
 "score": 55.3,
 "missing": [],
 "tools": [
  "list_capabilities",
  "size_cable",
  "check_part_p",
  "get_certificate_schema",
  "check_certificate",
  "check_grid_connection",
  "trade_profile"
 ],
 "tool_docs": [
  {
   "n": "list_capabilities",
   "d": "Lists Spark Pack's tools, the regulations edition it targets, what it covers (nations, circuit types, cable types, installation methods) and what it deliberatel"
  },
  {
   "n": "size_cable",
   "d": "Sizes a UK final circuit or sub-main and shows the working: design current (with cooker diversity), protective device rating, the smallest cable size that passe"
  },
  {
   "n": "check_part_p",
   "d": "Answers whether domestic electrical work in England or Wales must be notified to building control under Part P of the Building Regulations, with the reason and "
  },
  {
   "n": "get_certificate_schema",
   "d": "Returns the fields an Electrical Installation Certificate (eic), Minor Electrical Installation Works Certificate (minor_works) or Electrical Installation Condit"
  },
  {
   "n": "check_certificate",
   "d": "Checks a filled EIC, Minor Works certificate or EICR (shape from get_certificate_schema) and returns `ready_to_transfer`, every missing required field by path, "
  },
  {
   "n": "check_grid_connection",
   "d": "For solar PV, batteries, V2G chargers, EV chargers and heat pumps in Great Britain: says which network operator process applies and when. Generation: G98 (fully"
  },
  {
   "n": "trade_profile",
   "d": "Checks the electrician's own business details (Nero Trade Profile v1: trading name, Companies House number, competent person scheme and number, postcode, contac"
  }
 ],
 "passed": true,
 "auth_required": false,
 "fail_reason": null,
 "category_confidence": 0.573,
 "category_source": "classifier",
 "category_scores": {
  "gov-records": 1.49,
  "engineering": 0.57,
  "maps": 0.29,
  "crm-sales": 0.29
 },
 "subcategory": "company-registries",
 "id": "io-github-nero-engine-spark-pack",
 "listing": {
  "plan": "curated",
  "fee_usd": null,
  "note": "Listing fees are not active. Placement is earned only by test results."
 },
 "status": "listed",
 "first_seen": "2026-11-24",
 "uptime_days": "2/2"
}