Costable — Parametric Should-Cost Analysis
Parametric should-cost: P50/P80/P90 estimates, 801 materials, 25 countries, quote review.
Status: Listed — passed its latest tests · Score: 41.7/100 · Category: Engineering, CAD & hardware, Calculators & everyday utilities, Research, science & academic
Connect: https://costable.ai/api/mcp (streamable-http)
Score breakdown
| latency | 93.9 |
|---|---|
| tool docs | 100 |
| breadth | 61 |
| freshness | 50 |
| license | missing |
| adoption | missing |
| protocol | 40 |
Live test results
| tested at | 2026-11-25T09:16:00.326Z |
|---|---|
| http status | 200 |
| initialize | ok |
| tools list | ok |
| tool count | 10 |
| latency ms | 465 |
| tools list ms | 420 |
| protocol version | 2024-11-05 |
| oauth discovery | missing |
| server info | {"name":"costable","version":"1.0.0"} |
| error | missing |
Usage and freshness signals
| github stars | missing |
|---|---|
| license | missing |
| repo pushed at | missing |
| repo archived | missing |
| npm downloads 30d | missing |
| adoption note | missing |
| registry updated at | 2026-08-22T10:09:09.629895Z |
| registry published at | 2026-08-22T10:09:09.629895Z |
| pypi downloads | missing |
Tools (10)
estimate_part | Instantly estimate the should-cost of a manufactured part using natural language. Returns P50 (median), P80 and P90 cost-at-risk per unit based on Monte Carlo s |
|---|---|
search_materials | Search the Costable materials database (37 materials with LME-sourced pricing). Returns material name, category, price per kg, density, and strength properties. |
search_processes | Search the Costable manufacturing process database (41 processes). Returns process name, category, machine rate ($/hr), and cycle time model. |
get_labour_rates | Get manufacturing labour rates ($/hr) for all skill levels in a given country. Data covers 16 skill levels across 25 countries (ILO/BLS/ABS sourced). |
create_cost_model | Create a new parametric cost model in Costable. Returns the model ID which is used by add_material_to_model, add_process_to_model, calculate_cost_model, and com |
add_material_to_model | Add a material (BOM line) to an existing cost model. Searches the materials database by name query — no need for exact IDs. |
add_process_to_model | Add a manufacturing process step to an existing cost model. Searches the process database by name query — no need for exact IDs. |
calculate_cost_model | Run the Monte Carlo should-cost calculation on a cost model. Returns P50 (median), P80 and P90 cost-at-risk per unit, plus a full cost breakdown (material, labo |
compare_manufacturing_countries | Run the cost model across multiple manufacturing countries simultaneously to identify the optimal sourcing location. Returns P50/P80/P90 per country and % delta |
review_supplier_quote | Analyse a supplier quote against Costable's should-cost benchmarks. Returns a line-by-line delta (% over/under should-cost), verdict (LOW / COMPETITIVE / HIGH / |
Links: JSON · first seen 2026-11-24 · days passed 2/2 · registry name io.github.1337mofo/costable