DC Hub: Data Center & Energy Intelligence
Orchestration layer for data center and energy intelligence. execute_plan, DCPI, power grid, fiber.
Status: Listed — passed its latest tests · Score: 88.3/100 · Category: Engineering, CAD & hardware, Finance & markets, Agent infrastructure & registries · Ranked: #1 in Engineering, CAD & hardware (MCP)
Connect: https://dchub.cloud/mcp (streamable-http)
Score breakdown
| latency | 100 |
|---|---|
| tool docs | 100 |
| breadth | 100 |
| freshness | 100 |
| license | 100 |
| adoption | 61.1 |
| protocol | 100 |
Live test results
| tested at | 2026-11-24T21:34:56.786Z |
|---|---|
| http status | 200 |
| initialize | ok |
| tools list | ok |
| tool count | 98 |
| latency ms | 174 |
| tools list ms | 374 |
| protocol version | 2025-06-18 |
| oauth discovery | missing |
| server info | {"name":"DC Hub","version":"2.12.63"} |
| error | missing |
Usage and freshness signals
| github stars | 3 |
|---|---|
| license | MIT |
| repo pushed at | 2026-11-25T01:14:49Z |
| repo archived | false |
| npm downloads 30d | 4660 |
| adoption note | missing |
| registry updated at | 2026-11-23T08:12:11.591972Z |
| registry published at | 2026-11-23T08:12:11.591972Z |
| pypi downloads | missing |
Tools (98)
execute_plan | Answers any data center power, grid, interconnection queue, time-to-power, fiber or site question in one call. Pass the user's question unchanged as intent. Ret |
|---|---|
get_api_key | Use this when the user wants more DC Hub data center data than keyless allows, or asks for a key; no key is needed to start. DATA USE: the optional email, used |
search | Use this when a Deep Research or ChatGPT-connector client needs a data center facility search (search/fetch format). Returns a list of matching data-center faci |
fetch | Use this when you have an id from `search` and need that data center facility record (search/fetch format). Returns {id, title, text, url, metadata} — a citable |
search_facilities | Use this when the user asks which data centers exist, or who operates in a city, state or country; filters: country, state, city, operator, MW range, tier or te |
get_facility | Use this when the user asks about one data center facility: name, operator, address, lat/lon, power capacity (MW total/used), cooling type, fiber providers (cou |
get_market_intel | Use this when the user asks about a data-center market (metro supply, operators, pipeline, pricing): facility count, tracked MW, status mix, top providers, rece |
get_market_dcpi_rank | Use this when the user asks where a data center can get grid power, how fast, or whether a market is a BUILD, CAUTION or AVOID (e.g. "Where can a 100 MW data ce |
predict_market_trajectory | Use this when the user asks where a data center market's power outlook is heading (next 1-8 quarters). Projects excess_power_score and constraint_score forward |
get_gas_index | Use this when the user asks which US states suit gas-fired data center power: the Data Center Gas Index (DCGI), a per-state score. ★ DO NOT COMPARE a DCGI figur |
get_gas_economics | Use this when the user asks what behind-the-meter gas power costs in a US data-center market: Henry Hub spot, regional basis differential, and the delivered ind |
get_grid_scoreboard | Use this when the user asks how power grids compare: demand, fuel mix or renewable share. GLOBAL grid scoreboard — 9 US grid operators (the 7 US ISOs PJM, ERCOT |
compare_isos | Use this when the user asks to compare two to four power grids side by side — fuel mix, demand, renewable/gas share, and for the US ISOs interconnection-queue d |
get_intelligence_index | Use this when the user asks how the data center market looks overall, across all markets: ONE global DC Hub index, not a per-market score, and it takes no argum |
list_transactions | Use this when the user asks about data center M&A, acquisitions or capital deals — tracked deals (2019-present; total_count in the result, where shown, gives th |
get_news | Use this when the user asks for data center industry news or headlines (execute_plan also pulls news inside a broader market question). Curated data center indu |
semantic_search | Use this when a data center or energy question is conceptual or fuzzy and keyword filters fall short — semantic (meaning-based) retrieval across DC Hub's indust |
search_intelligence | Use this when you need meaning-based search over DC Hub's data center intelligence corpus, choosing corpora — industry news, M&A deals, discovered facilities, p |
get_market_context | Use this when you need a whole data center market briefing for your context window — one call returns a token-budgeted context pack for a data-center market: DC |
get_iso_context | Use this when you need a whole power grid (ISO) briefing for your context window — one call returns a token-budgeted context pack for a US ISO/RTO: live grid sn |
get_pipeline | Use this when the user asks what data centers are being built, announced or permitted in a market or by an operator. Example: "What is under construction in Nor |
get_power_pipeline | Use this when the user asks where new power generation is coming online (the forward supply pipeline) — e.g. "how much new generation is planned in Virginia / t |
get_infra_projects | Use this when the user asks what gas pipeline or transmission line projects are planned, proposed, approved or under construction — the forward build-out, not t |
get_power_availability_timeline | Use this when the user asks when power will be available, or about time-to-power, in a US state: year by year. Composes: new generation coming online from EIA-8 |
get_global_power | Use this when the user asks about power plants worldwide or in a non-US country — operating AND the forward pipeline (announced / pre-construction / under-const |
get_interconnection_queue | Use this when the user asks about grid interconnection queues: how congested an ISO's queue is or how much data-center load is waiting. Returns queued generatio |
get_refined_queue | Use this when you need interconnection queue projects filtered server-side. Instead of pulling the raw queue into context to filter (token-expensive, error-pron |
get_retirement_headroom | Use this when the user asks where retiring power plants free grid capacity: scans EIA-860M retirements to find near-term transmission grid headroom — a retiring |
get_hosting_capacity | Use this when the user asks how many MW a distribution feeder can take: utility-published hosting capacity — the MW a NAMED distribution feeder can actually tak |
analyze_parcel | Use this when the user has a land parcel for a data center site: structured read of its boundary — pass your own GeoJSON Polygon/MultiPolygon, OR just lat+lon a |
rank_sites | Use this when you have enriched candidate data center sites to rank under constraints — the normalization contract that lets you compare sites across separate a |
discover_tools | Use this when you are unsure which DC Hub data center, power or grid tool fits: lists tools by family. Returns _entity=tool_families — a front_door block (execu |
plan_query | Use this when you want to see the plan for a data center question without running it (execute_plan runs the same planner and returns the answers). Reach for pla |
save_to_shortlist | Use this when the user wants to keep a data center site on a named shortlist that survives across conversations (Phase 5 statefulness). Snapshots the site's obj |
get_shortlist | Use this when the user wants to see a saved data center site shortlist. With refresh=true (default) each site is RE-SCORED against the current national percenti |
set_shortlist_alert | Use this when the user wants a drift alert on a saved site shortlist so you can stop polling and be notified when a site's national standing moves materially (P |
suggest_reallocation | Use this when a saved data center site drifts (its national standing dropped — surfaced by get_shortlist refresh or a set_shortlist_alert firing), get replaceme |
get_grid_data | Use this when the user asks for live electricity grid data (power demand, fuel mix) for one grid: the 7 US ISOs (PJM, ERCOT, CAISO, MISO, SPP, NYISO, ISO-NE), T |
get_changes | Use this when the user asks what changed in data center markets, facilities or deals since a date. Returns DCPI 7-day market movers, newly discovered facilities |
get_facility_risk_delta | Use this when the user asks how a data center facility's (or its market's) power risk changed recently — "has this site gotten riskier lately?". Returns the REA |
save_site | Use this when the user wants to save a data-center site to track it. Needs a key (get_api_key); keyless returns auth_required. Save a candidate data-center site |
list_saved_sites | Use this when the user asks to see their saved data center sites. Needs a key (get_api_key); keyless returns auth_required, not an empty list. Use when a user a |
set_market_alert | Use this when the user wants alerts on a data center market's DCPI power score: subscribes to movement alerts (needs a key) — get notified when its Excess-Power |
subscribe_digest | Use this when the user asks for a weekly data center market email: subscribes them to a digest of what changed in the markets and sites they queried (DCPI mover |
set_site_alert | Use this when the user wants an email watch on a saved data center site (needs a key) — DC Hub emails you when that site’s DCPI score, grid capacity, or nearby |
export_dataset | Use this when the user wants to export their saved data center sites for offline analysis, a spreadsheet, or ingestion into another tool (needs a full-access ke |
find_sites | Use this when the user has no data center site yet and wants candidate search areas (site selection by substation voltage, gas and fiber distance); execute_plan |
analyze_site | Use this when the user asks whether a specific site or coordinate works for a data center (lat/lon, or a market name for a market-level read). Returns a 0-100 c |
get_composite_site_score | Use this when the user wants one 0-100 data center site suitability verdict for a lat/lon WITH an explicit per-factor coverage map — which factors are actually |
get_disaster_risk | Use this when the user asks about natural-hazard risk for a data center site (US lat/lon) — flood, wildfire, hurricane, earthquake, heat, drought, tornado, etc. |
get_climate_intel | Use this when the user asks about seismic or climate design inputs for a data center site (lat/lon) — the layer that drives data-center structural bracing cost |
generate_site_analysis | Use this when the user wants a shareable data center Site Analysis PDF for ONE lat/lon (a powered-land parcel, a candidate campus) — the polished client deliver |
compare_sites | Use this when the user has 2-4 candidate data center sites and asks which is best. Pass locations as "lat,lon;lat,lon" and optional capacity_mw. Returns each si |
get_infrastructure | Use this when the user asks what power infrastructure is near a site: substations (count + max voltage_kv within radius), transmission lines (>69 kV path overla |
get_fiber_intel | Use this when the user asks about fiber routes, carriers or connectivity for a market: long-haul, metro, dark or IX routes. Filter by carrier, route_type, marke |
get_fiber_readiness | Use this when the user asks whether one data center site (lat/lon) is fiber-ready: near-net distance to a carrier-served facility, how many distinct fiber carri |
get_subsea_cables | Use this when the user asks about subsea (submarine) cable landings near a site, or the cable catalogue. The physical internet crossing an ocean lands at a fini |
get_peering_intel | Use this when the user asks about internet exchange (IX) and peering density for a data center site (PeeringDB). Pass lat+lon for the PEERING PROFILE around tha |
get_metro_fiber | Use this when the user asks which US metro has the deepest fiber, or wants a market's fiber profile — carrier count, total route-miles, on-net buildings, a 0-10 |
get_energy_prices | Use this when the user asks what electricity or natural gas costs for a data center in a US ISO or state ("what does power cost in ERCOT?", "retail rate in Virg |
Links: website · repository · JSON · first seen 2026-11-24 · days passed 2/2 · registry name cloud.dchub/mcp-server