Spark Pack
Cable sizing, Part P, certificate checks and G98/G99 for UK electricians' AI assistants
Status: Listed — passed its latest tests · Score: 55.3/100 · Category: Government & public records, Engineering, CAD & hardware, Security & identity
Connect: https://spark-pack.nerolabs.workers.dev/mcp (streamable-http)
Score breakdown
| latency | 100 |
|---|---|
| tool docs | 100 |
| breadth | 52.9 |
| freshness | 100 |
| license | 0 |
| adoption | 0 |
| protocol | 100 |
Live test results
| tested at | 2026-11-24T21:38:57.656Z |
|---|---|
| http status | 200 |
| initialize | ok |
| tools list | ok |
| tool count | 7 |
| latency ms | 141 |
| tools list ms | 120 |
| protocol version | 2025-06-18 |
| oauth discovery | missing |
| server info | {"name":"nerolabs-spark-pack","version":"1.1.0"} |
| error | missing |
Usage and freshness signals
| github stars | 0 |
|---|---|
| license | missing |
| repo pushed at | 2026-11-13T00:17:09Z |
| repo archived | false |
| npm downloads 30d | missing |
| adoption note | missing |
| registry updated at | 2026-11-13T00:19:51.063807Z |
| registry published at | 2026-11-13T00:19:51.063807Z |
| pypi downloads | missing |
Tools (7)
list_capabilities | Lists Spark Pack's tools, the regulations edition it targets, what it covers (nations, circuit types, cable types, installation methods) and what it deliberatel |
|---|---|
size_cable | Sizes a UK final circuit or sub-main and shows the working: design current (with cooker diversity), protective device rating, the smallest cable size that passe |
check_part_p | Answers whether domestic electrical work in England or Wales must be notified to building control under Part P of the Building Regulations, with the reason and |
get_certificate_schema | Returns the fields an Electrical Installation Certificate (eic), Minor Electrical Installation Works Certificate (minor_works) or Electrical Installation Condit |
check_certificate | Checks a filled EIC, Minor Works certificate or EICR (shape from get_certificate_schema) and returns `ready_to_transfer`, every missing required field by path, |
check_grid_connection | For solar PV, batteries, V2G chargers, EV chargers and heat pumps in Great Britain: says which network operator process applies and when. Generation: G98 (fully |
trade_profile | Checks the electrician's own business details (Nero Trade Profile v1: trading name, Companies House number, competent person scheme and number, postcode, contac |
Links: website · repository · JSON · first seen 2026-11-24 · days passed 2/2 · registry name io.github.Nero-Engine/spark-pack